Wood Fibre Insulation in a Timber Frame Wall: What a European Tender Actually Checks

Most people comparing wood fibre insulation start with the lambda value and the price per cubic metre. On a private house that is reasonable. On a tendered project it is close to irrelevant, because the price is only looked at after the documents have been accepted, and a surprising number of products never get that far.

This is written for people quoting into European projects: contractors, timber frame builders, specifiers and anyone who has been handed a bill of quantities with a named product in it and the words "or equivalent" beside it.

The document set at a glance

Document What it establishes Who asks for it
CE marking and DoP The performance the manufacturer declares and is liable for Every project in the EU
EN 13501-1 classification report Reaction to fire, the Euroclass Building control, fire strategy
ACERMI certificate Certified thermal resistance, thickness by thickness French tenders
Avis Technique or DTA That the product is accepted in a defined build up French tenders, inspection office
FDES or EPD Environmental performance, embodied carbon Public and carbon scored projects
REACH statement Substance compliance The contractor's quality file

The rest of this page is what each of those actually proves, and where they fail.

The documents, in the order they get asked for

CE marking and the Declaration of Performance

Insulation placed on the European market is covered by the Construction Products Regulation. In practice this means two things travel with the product: the CE mark and a Declaration of Performance, the DoP.

The DoP is the document that states what the manufacturer declares and is legally accountable for. Thermal conductivity, reaction to fire, dimensional stability, water absorption, vapour diffusion resistance. If a supplier cannot produce a current DoP with the exact product designation on it, the conversation is over before it starts. Not because an inspector will necessarily catch it, but because the main contractor's own quality file has a hole in it, and they know it.

A point that catches people out: the DoP is product specific. A DoP for the standard version of a product does not cover the fire retardant version, even where the trade name is almost identical. Check that the designation on the document matches the designation in your quotation, character for character.

Reaction to fire, EN 13501-1

Every insulation product has a Euroclass. Untreated wood fibre usually sits at class E. Versions treated with a fire retardant typically reach B-s1,d0 or B-s2,d0.

Which class you need depends on the building, not on the material. Public buildings, buildings receiving the public, buildings above a certain height, and escape routes all carry their own requirements, and they differ by country. The mistake to avoid is assuming that because wood fibre is a natural material it will be judged leniently. It will not. A specification that calls for B-s1,d0 will reject class E regardless of how sustainable the product is.

Ask for the classification report number and the body that issued it. A certificate without a report behind it is a design, not evidence.

ACERMI, if the project is in France

ACERMI is the French certification scheme for insulation. It is voluntary in theory. In practice, on anything tendered in France, it is the number that gets cited, and a declared thermal resistance without ACERMI behind it tends to be treated as a claim rather than a fact.

The important detail is that ACERMI certifies specific thicknesses. More on that below, because it is the single most common way a quotation falls apart late.

Avis Technique or DTA

For a build up rather than a bare product, France uses the Avis Technique, and the Document Technique d'Application where the product is covered by a European harmonised standard.

An Avis Technique covers a defined application. Insulation between studs in a timber frame wall to NF DTU 31.2 with external bracing and ventilated cladding is one application. Internal partitions to NF DTU 25.41 is another. Attics and roof slopes is a third. A product can hold one and not the others.

Three things worth checking before you quote:

The validity date. These documents expire, and renewal is not automatic. A document that runs out two months before the site starts is a problem you will be asked to solve.

The scope. Read what the document actually covers rather than assuming. A DTA for insulation between studs does not necessarily cover the same insulation used together with an external insulation layer on the frame. That kind of exclusion is easy to miss and expensive to discover.

The thickness range inside each application. The document can list a narrower set of thicknesses for partitions than for walls, even though the product itself is certified across the full range. We have seen 40 to 100 mm for partitions on a product certified from 40 to 240 mm, on a project that wanted 140 mm in exactly those partitions.

One more thing, and it matters for overseas work. French Avis Techniques apply to metropolitan France. For an overseas territory the extension of scope is a matter for the inspection office on the project. That is not a reason to avoid the product. It is a reason to raise it early rather than at the moment of handover.

FDES and the environmental declaration

Public projects in France increasingly ask for an environmental declaration registered on the INIES database, the FDES. Elsewhere in Europe the equivalent is an EPD.

There is a distinction worth understanding. An individual FDES applies to one manufacturer's product and carries its real figures. A collective FDES covers a product category and carries conservative default values. A default value is better than nothing, and worse than a real one, and on a project scored partly on carbon that difference shows up in the result.

REACH and the rest

Standard, and rarely a sticking point for wood fibre. Ask for the statement, file it, move on.

The thickness trap

This is the one that costs real money, and it is worth a section of its own.

Certification attaches to thicknesses, not to products in general. A flexible wood fibre batt might be certified at 40, 60, 80, 100, 120, 140, 160, 180, 200 and 240 mm, with a declared thermal resistance against each one: 2.20 m2K/W at 80 mm, 2.75 at 100 mm, and so on up the list. If your structural layout wants 85 mm, you have a problem that has nothing to do with manufacturing.

A manufacturer can usually make 85 mm. It is a special production run, with a minimum quantity, its own lead time and its own price. What they cannot do is give you a certified thermal resistance for it, because 85 mm is not in the certificate. In a tender you then have a thickness you can supply and a performance you cannot evidence.

The fix is to design to certified thicknesses from the start. Where the structure genuinely dictates an odd dimension, take the next certified thickness up and solve the difference in the build up rather than in the insulation. The full thickness and R value table is in the insulation thickness page.

If a supplier offers you a non standard thickness without mentioning any of this, ask them directly whether it appears in the certificate. A supplier who raises it before you do is telling you something useful about how they work.

What "or equivalent" actually means

Most European specifications name a product and then add "or equivalent", in French "ou equivalent". This is not decoration. Public procurement rules generally require it, precisely so that a specification cannot lock out competitors.

It does give you a real opening. It is not a blank cheque.

Equivalent means equivalent on the characteristics the specification relies on. If the named product carries B-s1,d0, an ACERMI certified lambda and an Avis Technique for the application, then an equivalent needs the same three, from bodies the client's inspector will accept. A product that matches on price and thermal conductivity but has no French documentation is not an equivalent. It is a cheaper product.

Two practical points:

Find out how equivalence is assessed on that particular project, and when. On some projects the substitution has to be approved by the architect before the offer goes in. On others it is judged with the offer. The deadline for the first is always earlier than the deadline for the tender, and missing it disqualifies you quietly.

Put the comparison in writing yourself. A table with the specified product's characteristics in one column and yours in the other, with document references, does more for your case than any amount of description. It also makes it easy for the architect to say yes, which is the actual objective.

What this means in practice

If you are sourcing wood fibre insulation for a project rather than a house, the questions to ask a supplier are narrow and they are all about evidence:

  • The current DoP, with the exact product designation
  • The EN 13501-1 class, with the classification report number and the issuing body
  • ACERMI, and specifically which thicknesses are listed
  • Any Avis Technique or DTA, its number, its validity date and what application it covers
  • Whether an individual FDES or EPD exists
  • Confirmation that the thickness you need is a certified one

A supplier who can answer all of that in one email is worth more than one who is two euros cheaper per cubic metre. The documents are what the project is actually buying.

Two questions we get asked

Is CE marking enough on its own? For placing the product on the market, yes. For a tendered project, usually not. The CE mark and the DoP say what the manufacturer declares. A French tender then asks who certified the thermal resistance and who accepted the build up, and those are ACERMI and the Avis Technique. Two separate questions, two separate documents.

The specification names a brand we cannot get. Is that the end of it? No, if the words "or equivalent" are there, and they almost always are. It becomes a documents exercise rather than a price exercise. Send us the specification section and we will tell you plainly whether we can match it line for line, including where we cannot.

Get a price

Tell us the country, the application, the fire class the specification asks for, the thickness and the cubic metres or square metres. You get a price, the lead time, and the certificate pages for the exact product and thickness, so your submittal is assembled before you commit rather than after you win.